Option C+, Phase II (2005)
Estimated to open in Dec. 2010; requires $5-million from community
On December 8, 2005, HRM was to reveal which of the three facility options presented at the October 19 meeting they were proceeding with (Option A, Option B, or Option C). Instead, Councillors unveiled new plans consisting of a two-phase approach. This option was called Option C+.
While the overall C+ plan was considered an upgrade from Option C, much of the necessary components beyond a swimming pool were deferred to phase II with the fund raising burden of $8-million total placed entirely on the community. In actual fact, Phase I was only a slight upgrade from the original Option B which Build it Right has steadfastly maintained is not adequate for the community.
Side by Side Comparison
Below is a side by side comparison of Option C+, Phase II and HRM's previous Option C. Of note, the Aerobic and Dance studio presented in Option C was dropped, the fitness centre reduced in size, a wellness centre added with community/meeting rooms added to phase II (originally part of Option B).
** Current Plan **Option C+ Phase II |
Option Presented in October 19 meetingOption C |
Estimated Open December 2010Estimated areas of phase II - 27,500 sq. ft. Cost estimated - $5 million (all funds must be raised by the community to build) Aquatic Centre
Fitness Centre
Wellness Centre
Community Rooms
Youth Centre |
Estimated area difference between Option B & C: 32,500 additional sq. ft. Estimated cost difference between Option B & C: additional $6.5 million Aquatic CentreExtra two lanes from Option B which was a four lane 25m pool Fitness Centre
Aerobic and dance studio
|